Before you start laying the laminate,it is necessary to prepare a qualitative surface of the floor. If this is not done, the finishing material for the floor will quickly deteriorate, and further operation will become impossible. The preparation of the floor for the laminate has its own distinctive features in accordance with the starting floor covering, the functionality of the room and the type of the finishing material. The master must necessarily take into account these starting criteria, which will determine the further actions.
Laminate has a long service life,if it is properly tended and properly laid. But during the repair will require a lot of effort to create the ideal conditions for the finishing material of this species.
Preparing the floor for a laminate is the following:
These stages are the main ones for the preparation offloor covering before laying laminated material. If the exploitation of such a floor provides a long-term option, then it is worthwhile to take care of its strengthening.
The additional material is determined in accordance with the base surface on which the laminate will be laid. Auxiliary material is a substrate for the main finish:
Other components may be needed.Determine the need for other finishing materials can be, if carefully examine the situation. Sometimes auxiliary mixtures and substances for stripping and processing are required.
Preparing the floor for a laminate requires not only experience and supporting material, but also the availability of appropriate tools:
Additional tools may be needed whensubject to the availability of any special materials or coating conditions. For example, during the installation itself, a screwdriver and a rubber hammer are required.
The preparation of the floor for laminate is carried out in several stages:
Only after all the steps described above, you can begin to lay the laminate. Otherwise, the quality and further operation of this flooring may remain in question.
The method of dismantling the old coating depends on theWhat material is present on the floor. If lumens and slopes are normal, and there are no deformations and chips on the surface of the old coating, the laminate can be laid without prior dismantling. This can be implemented with virtually any coating other than carpet. Because it can further shrink, which will adversely affect the laminate.
Preparation of floors for a laminate with their own hands is carried out by dismantling the old coating:
The styling quality will depend on the optimal deviation parameters: a difference of less than 3 millimeters per 1 running meter and a maximum of 1 millimeter of clearance per 1 running meter.
Preparing a wooden floor for a laminate requires two basic points: the difference between the boards is a maximum of 2 millimeters by 2 meters in length; maximum 4 millimeters of slope per 2 meters of space.
Now let's describe the process of preparing a wooden floor for a laminate with your own hands:
When the surface is flat and clean, you can mount the substrate. Elimination of large defects between boards is carried out with the help of building foam, sealant.
Preparation of a concrete floor for a laminateis carried out in accordance with the initial state of concrete. Sometimes it is necessary to fill the self-leveling mixture over the entire surface. It happens that it may be necessary to partially restore the concrete base.
The new self-leveling fill is mounted like this:
Partial restoration is performed with cement mortar. Focal repair work is carried out in accordance with all the rules: exposure level, grinding.
В квартирах полы исключительно бетонные, поэтому All installation and dismantling work is carried out in accordance with the conditions of preparation of the concrete pavement. If there is old linoleum on the floor, then it can also be left and laid laminate on the starting surface.
Preparation of the floor in the apartment under the laminate has itsfeatures associated with mounting the lining. If the laminate is laid on the ground floor, then auxiliary waterproofing is required. It is organized with the help of polyethylene with a thickness of 0.01 cm. The polyethylene in the joints is fixed with the help of construction adhesive tape.
The lining creeps along the same principle as polyethylene. Its joints should coincide with the points of connection of the polyethylene base. This will help increase the effectiveness of waterproofing.
Preparation of the floor under the laminate plywood is made quite often. This trick is used to improve the quality of the surface of a wooden floor. Often plywood is also used for the following purposes:
First lags of small height are recorded.They impose plywood sheets, the height of which is not more than 12 millimeters and not less than 10 millimeters. The distance between the screws - no more than 15 centimeters.
Preparing the floor for laying laminate isnot only in the successful formation of a smooth base, but also in the proper installation of the floor covering. The first thing to check is the quality of the self-leveling screed, if any. The screed must be dry. Some brands guarantee full drying in a week. Normally, all moisture from the screed "evaporates" in two weeks.
If the alignment was done usingplywood sheets or chipboard, the seams between the plates need to be sealed with sealant. Polyurethane foam is used less frequently, as this material may shrink over time.
Depending on the characteristics of the microclimatepremises, lining installation. Focusing on it, you need to make the choice of the substrate material. Additional materials for insulation are laid on the lining and fixed with adhesive tapes.
To learn some secrets about the correct installation of laminate, you can turn to qualified professionals who independently made the installation and disassembly of flooring.
Do the laminate in the apartment with your own hands.quite difficult, so it is better to seek the help of professionals. If you still want to learn how to lay it yourself, then for you there are special courses or forums for preparing laminate floors, where you can learn how to work with building materials of various configurations. Recommendations can also be obtained using paid specialist advice.