/ / Solid Household Waste Landfill: license and construction

Landfills: license and construction

At the current time in Russia is about 24000 objects that are related to landfills of solid domestic waste. However, only a tenth of them are operated on a legal basis, not to mention compliance with the rules and regulations established by Rosprirodnadzor. This is partly due to the problems that arise at the stages of registration, design and construction of such facilities. It is not a secret that the solid waste landfills are very specific and impose special requirements on the owners on the content, as well as reclamation or transfer to another status. Each of these issues should be studied in detail to improve the chances of realizing a modern, safe and legally clean landfill.

Licensing of solid waste landfills

polygons tbo

Waste collection and disposal activities are strictlyregulated and subject to registration. A document authorizing the handling of domestic and industrial waste is a license. Before you start the registration procedure, you need to make sure that the company meets the requirements of the supervisory authority that will evaluate the landfill. The license is issued only on the condition that the facility meets the sanitary and epidemiological standards, has the necessary equipment in the equipment, is serviced by workers with professional training, etc. In addition, the applicant must provide a draft system that will carry out production control during the handling of waste.

Documents for obtaining a license

Those wishing to obtain a license to conduct this kind of activity must submit to Rosprirodnadzor a package that includes the following set of documents:

  • documents of the legal entity;
  • a list of works to be implemented in the field of waste management;
  • proof of ownershipa site where it is planned to locate a waste collection area (often landfills are built up by special facilities, which also require the relevant documents);
  • certificate of successful passing of ecological expertise;
  • certificates for the right to handle waste;
  • certificate of payment of state duty for obtaining a license.

License issuance procedure

Rosprirodnadzor checks information and documents,sent by the applicants, within 5 days. Based on the results of the inspection, a decision is made in the form of a refusal or license. As a rule, SHW landfills are licensed if they initially meet the technical, legal and environmental requirements. It also matters the correctness of the package of documents. During procedural processing, Rosprirodnadzor employees check the completeness and reliability of the information specified in the application and documents.

design of polygons tbo

It is important to note that in the construction of the lastso-called self-regulating communities (SROs) are gaining popularity, participation in which relieves new market participants from the need to obtain a corresponding license. In the sphere of waste management, this practice is only gaining momentum, but joining the SRO of this profile can be very useful. Representatives of such associations not only legalize their landfills, but also receive legal, as well as information and technical support from their colleagues, which is especially important at the first stages of the enterprise development.

Designing polygons

polygon tbo license

At the stage of project development, thespecial designation of the landfill as an object designed to collect and neutralize domestic waste. To minimize the hazardous effects of such complexes on the ecological situation of the adjacent territory, the project provides for protective systems that act as barriers to the path of pollutants. Their presence and causes the difference between special landfills and ordinary landfills.

To successfully neutralize harmful effects in the operation of a future facility, the design of solid waste landfills should include the following works:

  • Development of a waterproofing system for a contaminated massif. This is necessary to prevent direct contact between landfill and precipitation.
  • Working out and drawing up of a plan of a surface of a zone of a range in view of a site of slopes for maintenance of tap of surface drains.
  • Creation of a ventilation system for the landfill.
  • Development of a filtrate control and monitoring system.
  • Drawing up a plan for gardening.

The design is carried out in accordance with the principles that allow minimizing the likelihood of an environmental crisis and pollution environment. The most important from the point of view of safety are water objects.

Construction of polygons

construction of the polygon tbo

Measures for the technical implementation of projectsLandfills in many respects are similar to traditional objects of construction. Such complexes may include the same engineering communications, economic structures, etc. The difference is the inclusion of special requirements for insulation and the selection of building materials. In addition, the construction of a solid waste landfill site also involves the construction of sanitary facilities with anti-filtration screens, which are the main elements in any complex of this type.

Natural geological obstacles tothe spread of pollution in practice is rare, so developers are installing special protective screens on the surface of the work area. With the help of such barriers, the risk of harmful damage to the environment as a result of unfavorable environment of polygons is minimized.

Reclamation of polygons

Starting the design of the test site, one can not excludeprobability of its possible reclamation. This is a responsible exercise, in which the site occupied by the landfill acquires the former ecologically sound condition.

reclamation of polygons tbo

At the same time, recultivation of solid domestic waste landfills can be carried out according to different technological methods of neutralization, including the following stages:

  • Analysis of the test site and determination of its level of danger.
  • Consideration of the possibility of using alternative reclamation options.
  • Development of the project on neutralization and subsequent reclamation.

There are several groups of technological methods for eradicating a landfill. The base includes the extraction and disposal of waste in another safe place and destruction directly on the landfill.

Liked:
0
Popular Posts
Spiritual development
Food
yup