/ / What is a self-leveling floor mix?

What is a self-leveling mixture for the floor?

Leveling the floor is not as easy as it canseem. This is a complex process that even professionals can hardly cope with. But all the labor intensity significantly decreased after the self-leveling mixture for the floor appeared on the market. Currently, you can make a flat surface yourself.

self leveling compound for floor

What is a self-leveling compound for the floor?This is a special solution that is applied to the surface in order to hide any not too large defects. It is used before finishing the floor. One of the main advantages of the mixture is ease of use and high speed of solidification. Due to the not too large thickness, it is very often used in rooms with low ceilings.

In order to level the floor, you will needa set of specific tools: a container for the solution, roller, drill and nozzle. Before the self-leveling mix for the floor is laid, you will need to clean the surface from dust. In addition, there should not be any holes. After that, the floor will need to be covered with a not too thick layer of primer. It should be understood that all this should be done efficiently. Otherwise, the result of the work done will not please you.

Bulk floor prospectors
After all the initial preparation worksurfaces will be made, it is necessary to proceed directly to the preparation of the solution. To do this, purchased dry mix will need to be mixed with water. In this case, you must follow the instructions that are written on the package. It should be understood that in the tank you must first add water, and then pour out the mixture itself. In order for the self-leveling compound for the floor to become uniform, it must be thoroughly mixed with a drill. Given the fact that the solution tends to thicken quickly, it is necessary to use it immediately.

The last stage, after which the self-leveling floor inthe apartment will be ready, is the laying of the mixture. To do this, it is necessary to pour the resulting solution over the surface in equal portions. Pouring is required so that the next part fits next to the previous portion. It should be borne in mind that the thickness of the floor should be more than 50 millimeters. To get the desired thickness, you need to use a needle roller. In addition, with it, you can get rid of air bubbles. After the mixture is laid, it is necessary to wait for its complete drying. This can last from three to fourteen days depending on the layer and weather conditions. Only after the floor is dry, you can proceed to laying flooring.

self-leveling floor in the apartment

This work on the alignment of the surfacefully done. If you do not know which mixture to choose, then you can safely purchase the “Pitfalls” self-leveling floor, which has all the necessary advantages. Also it should be understood that the entire process of laying must be done with a partner. This need arises due to the rapid thickening of the mixture. Good luck in bringing the surface to an even state!