Now the topics on construction and repair,enjoy incredible popularity. Most of the buildings currently in operation were built at least 50 years ago and, quite predictably, today require major repairs.
Simple and complex solutions
There is a huge selection of different optionshow to make a floor in a private house. The final choice depends, first of all, on the financial means that people are willing to invest in repairs. Based on the available amount, you can determine the technology, materials and how to make a warm floor in the house. All possible options can be conditionally divided into two groups: with a complete redesign of the existing floor or its renewal.
Doing "from scratch"
The best way to make a floor in a private home is to:it is to perform it again, deleting the old one. Obviously, new materials appeared only recently, and therefore could not be used in old buildings. Usually in private houses wooden floor was made on the lag system. With proper installation it is quite warm and practical. However, now such a solution is of limited use.
Usually in response to a question about how to make sex inprivate house, offer a screed. To do this, all old designs are dismantled, and the base surface is leveled. Then the bottom base of the floor is filled with screening, brick crumb, sand or a mixture of them - this will create a kind of pillow. On top of this layer is placed material that cuts off soil moisture. It can be ruberoid, film, clay, dense foam, etc.
Further, it is necessary to determine the level of futurefill. To do this, from the bottom of the door upwards measure an arbitrary distance (30 cm, 50 cm, 1 meter) and along the entire perimeter mark on the walls. Then they are connected by a line, and already from it fall the same distance, put marks. They need to be connected with a cord. He will indicate the level of the future sex. Near the walls and in the center of the room are stuck bars, the upper point of which does not reach the cord by 100-150 mm - this is the thickness of the concrete cake. Level with them pour gravel, rammed. Above this layer is sand. The last layer is a waterproofing film.
The next step is to split the entire floor into1-2 m using rails, the height of which should match the cord. Mix the solution from the mixture of cement, screening and sand, which is alternately poured into the section.
Restoring the old
But many want to know how to make a floor in a house, notdestroying what is available on the lags. For this, rotten logs and boards are replaced, a system of ventilation of the underground space is being designed. The upper part of the boards is leveled. They are laid heat-insulating substrate, then plates OSB (although it is permissible and sheets of fiberboard). All layers are connected to the main floor.